Senda Rongzhong Building charging station officially launched 🎉
Experience charging as simple as fueling with Senda!
We are excited to share Senda has successfully deployed a new EV Charging Station in Rongzhong Building, Honglu Town, Fuqing City, providing much-needed charging infrastructure to meet the growing demand for EV in the region.🔋🔋🔋
1️⃣ Using the Senda E-Charge APP and mini program to scan the code for charging, which is convenient to operate.📱
2️⃣ Ensure stable power supply and emergency backup.⚡⚡⚡
Get In Touch
Recent Posts
-
What Is The Difference Between GGD Distribution Cabinet And MNS Low-Voltage Switchgear, Both Belonging To Low-Voltage Switchgear?
Jun 24, 2025 -
SF6 Is Favored For Its Compact Design In 10kV Inflatable Switchgear
Jun 12, 2025 -
🌟Celebrating a Major Triumph: Senda Electric Secures Significant Bid with State Grid!
Apr 25, 2025 -
Fujian Senda Electric Product Promotion Conference
Apr 11, 2025 -
HV, MV, and LV Substations: Differences and Applications
Mar 25, 2025